What is a Transport Assessment?
A Transport Assessment is a comprehensive and systematic process that sets out transport issues relating to a proposed development. It identifies what measures will be taken to deal with the anticipated transport impacts of the scheme and to improve accessibility and safety for all modes of travel, particularly for alternatives to the car such as walking, cycling and public transport.
In some cases, the transport issues arising out of a development proposal may not require a full Transport Assessment to inform the process adequately and identify suitable mitigation. In these instances, it has become common practice to produce a simplified report in the form of a Transport Statement. There will also be situations where the transport issues relating to a development proposal are limited, and no formal assessment is necessary.
Transport Assessments should consider the impact of the development on all transport modes, set out proposals to minimise the impact of the development on the transport network and promote measures to encourage sustainable transport. To this end, it is a usual requirement that a Transport Assessment is accompanied by a Travel Plan that will be implemented as part of the development proposals upon occupation and sets out measures to encourage sustainable transport.
The Transport Assessment process and the development of measures to encourage sustainable travel should be developed through consultation with the relevant authorities. This is an iterative process that often requires a number of revisions to the development proposals and sustainable travel measures before it can be agreed that the transport impact of the development has been reduced to a minimum. At this point the residual transport impact is assessed and mitigation measures are designed as necessary. A diagram taken from the Department for Transport guidance outlining the recommended approach is shown below:
This iterative approach to the Transport Assessment ensures that improvements to sustainable modes of transport are always considered first, with measures to increase the capacity of roads or junctions only considered at the end of the process to mitigate the residual traffic impact of the development.
Transport Assessments identify the impact of the development in ‘person trips’, which are then broken down by transport mode. This normally involves the use of the nationally accepted TRICS database that enables the calculation of person/vehicle trips rates for different forms of development. Alternatively the use of bespoke survey data from other development sites are used, which can give a more accurate estimate of trip generation if a suitably representative site can be found in close proximity to the development site being considered.
Once development trips have been estimated, the distribution of trips can be predicted though various techniques, including gravity models or using existing travel pattern information or other empirical data. Information is also gathered on any existing person/vehicle trips from the existing use of the site and these are discounted from the network, to produce a net increase or decrease in trips within agreed assessment periods, which are usually considered during weekday AM/PM and weekend peak hour periods.
Once the net trip predictions are known, the local transport network is examined to establish whether capacity exists that can adequately accommodate development trips. When assessing the traffic impact on the highway network, this usually requires assessment of the immediate highway links and junction connections, with the scope of assessment limited to the highway network where the potential for material impact is anticipated. The traffic assessment will potentially include junction modelling of traffic movements in existing, opening and future design year scenarios, which are normally at least 5 years hence. Surveys of existing traffic flows on the local network are required to establish the base situation, with traffic growth factors applied to predict future design year conditions, derived through the National Trip End Model (NTEM) forecasts or other empirical data.
Based on traffic surveys undertaken by Sanderson Associates at various locations throughout the United Kingdom between 2005 and 2011, it is clear that traffic volumes have not increased to the extent previously estimated. In some cases base traffic levels have decreased by up to 10% over this time period, resulting in improvements in network performance rather than capacity problems that were previously forecast. These changes in traffic growth forecasts have now been recognised by the DfT and can be calculated using TEMPRO software.
Where the traffic assessment identifies that the level of additional traffic movements cannot be accommodated by existing infrastructure, then off site highway improvements need to be considered to ensure that the impact of the development is neutral, i.e. that it is no worse than existing circumstances. Similarly pedestrian/cycle routes and public transport facilities are examined and if improvements are necessary to accommodate development trips, then improvements need to be considered to these facilities to encourage access by sustainable modes.
The operational safety of a development is a key consideration and a detailed appraisal of the recorded personal injury accident records for the local highway network is usually required, determining casualty, linked factors and common problems that may need to be addressed as part of the development.
The assessment concludes with a summary of its findings and recommendations outlining the developments compliance with National Planning Policy Guidance (most notably contained in PPG13 Transport), Statements and Governmental Departmental Guidance.
Require Assistance with a Transport Assessment?
Sanderson Associates have extensive experience in providing Transport Assessments, Transport Statements and Travel Plans for a wide variety of major and minor developments throughout the whole of the UK, Isle of Man and Ireland.
We would be pleased to provide you with our competitive fee quotation to provide you with our Transport Assessment Services, please call us on 01924 844080 or click here to visit our online secure server fee quote request form.
Some of our Recent Testimonials:
London Based Construction Company – Swept Path Analaysis
Wed, May 16, 2012
Environmental Consultancy – Flood Risk Assessment
Tue, Apr 17, 2012
Philip Waind, Waind Gohil Architects – Flood Warning and Evacuation Plan
Thu, Mar 01, 2012
Mr Terry Edge, Church Grove Residents Association – Highway Advice
Wed, Feb 15, 2012
Cable & Wireless, Flood Risk Assessment, Leeds
Mon, Dec 05, 2011
I J Hayfield MRICS, Director, Hayfield Robinson Commercial Property – Highway Advice
Fri, Nov 18, 2011
Mr Geoff Boffey, Flood Risk Assessment
Fri, Oct 28, 2011
Mr Charlton, Gwenfro, Pencader, Highway Advice
Mon, Oct 03, 2011
Mr Butterfield, Almondbury, Huddersfield, Highway Advice
Thu, Sep 15, 2011
Mr Howorth, Lancashire County Council, Flood Risk Assessment, Outdoor Centre, Windermere
Wed, Aug 17, 2011
Mr Walls, Community Centre Flood Risk Assessment, Mirfield Area
Fri, Aug 12, 2011
Rob James, Apollo Medical Partners, Flood Consequence Assessments
Mon, Jul 04, 2011
Carl Dyer, Partner, Thomas Eggar LLP, Design of Signal Works
Thu, Jun 30, 2011
Thu, Jun 23, 2011
E Kenny, Individual, Windsor, Flood Risk Assessment
Thu, Jun 16, 2011
D Sheppard, Design Manager, Green Frog Power, Flood Risk Assessment
Wed, Jun 08, 2011
S Burne, Managing Director, AEW Architects, Various Highway Related Work and Swept Path Analysis
Thu, May 19, 2011
Individual, Flood Risk Assessment (Somerset)
Sun, May 15, 2011
Individual, Flood Risk Assessment (Mirfield)
Wed, Mar 16, 2011
Tom Flanagan, Director, Paul Butler Associates
Thu, Feb 24, 2011
Fri, Feb 11, 2011
Tue, Jan 25, 2011
Individual, Newark – Flood Risk Assessment
Mon, Jan 24, 2011
Tue, Dec 14, 2010
Sat, Dec 11, 2010
Mon, Nov 22, 2010
Fri, Nov 19, 2010